competent person:GASAFE · Install a gas-fired boiler · received 18 Dec 2025 · GASAFE
competent person:GASAFE · Install a gas-fired boiler Install a heating system Install a hot water system without storage · received 1 Dec 2025 · GASAFE
Phase 1: Create the two bedrooms and ensuite bathroom in the front section of the flat. Phase 2: Structural and non-structual work, alterations to existing layout including erecting non-loadbearing stud partitions, structural works to the rear area of the flat, including the direction of an extension which will be accessed through the rear flank wall of the building and removal of a chimney breast on the rear party wall, alteration and/or renewal of services as necessary and general refurbishment · received 20 Oct 2025
competent person:NICEIC · Install a replacement consumer unit Install one or more new circuits · received 8 Mar 2025 · NICEIC
competent person:GASAFE · Install a gas-fired boiler · received 20 Nov 2024 · GASAFE
competent person:GASAFE · Install a gas-fired boiler · received 24 Oct 2024 · GASAFE
competent person:NICEIC · Install a replacement consumer unit Install one or more new circuits Partial rewire · received 25 Jul 2024 · NICEIC
Loft conversion with associated internal alterations · received 31 May 2024
Erection of a rear roof extension, rear extensions at first and second floor level, excavation of the front and rear gardens to form lightwells in connection with the enlargement of the existing basement; erection of bin/cycle stores at the front of the property, formation of a roof terrace at third floor level to the rear elevation, installation of 3no rooflights in the front roofslope and 1no rooflight above the main flat roof at roof level, installation of new windows to replace existing at first and second floor level to the rear elevation, replace existing doors and windows with new folding doors and a bay window at ground floor level to the rear elevation, alterations to the roof of single storey back addition to include the installation of a new sky lantern to replace the existing rooflight, replace existing window with French doors at first floor level. · received 29 Sept 2023
competent person:GASAFE · Install a gas-fired boiler · received 19 Jun 2023 · GASAFE
competent person:GASAFE · Install a gas-fired boiler · received 18 Dec 2025 · GASAFE
competent person:GASAFE · Install a gas-fired boiler Install a heating system Install a hot water system without storage · received 1 Dec 2025 · GASAFE
Phase 1: Create the two bedrooms and ensuite bathroom in the front section of the flat. Phase 2: Structural and non-structual work, alterations to existing layout including erecting non-loadbearing stud partitions, structural works to the rear area of the flat, including the direction of an extension which will be accessed through the rear flank wall of the building and removal of a chimney breast on the rear party wall, alteration and/or renewal of services as necessary and general refurbishment · received 20 Oct 2025
Show all 10 rows
competent person:NICEIC · Install a replacement consumer unit Install one or more new circuits · received 8 Mar 2025 · NICEIC
competent person:GASAFE · Install a gas-fired boiler · received 20 Nov 2024 · GASAFE
competent person:GASAFE · Install a gas-fired boiler · received 24 Oct 2024 · GASAFE
competent person:NICEIC · Install a replacement consumer unit Install one or more new circuits Partial rewire · received 25 Jul 2024 · NICEIC
Loft conversion with associated internal alterations · received 31 May 2024
Erection of a rear roof extension, rear extensions at first and second floor level, excavation of the front and rear gardens to form lightwells in connection with the enlargement of the existing basement; erection of bin/cycle stores at the front of the property, formation of a roof terrace at third floor level to the rear elevation, installation of 3no rooflights in the front roofslope and 1no rooflight above the main flat roof at roof level, installation of new windows to replace existing at first and second floor level to the rear elevation, replace existing doors and windows with new folding doors and a bay window at ground floor level to the rear elevation, alterations to the roof of single storey back addition to include the installation of a new sky lantern to replace the existing rooflight, replace existing window with French doors at first floor level. · received 29 Sept 2023
competent person:GASAFE · Install a gas-fired boiler · received 19 Jun 2023 · GASAFE