The works comprises of the complete strip out of the 4th floor south side and the penthouse (5th Floor). Removal of all the furniture, fixtures and fittings, strip out of Kitchen, Toilets, CCTV, Alarms, door access system and signage. Internal staircase linking 5th and 4th floors will be removed, existing opening will be infilled with new floor slab. A hoarding will be installed on the 5th floor to segregate the slab infill. Redecoration, reinstatement and associated works. · received 11 Dec 2025
CAT B office fit out to level 2.1 including the installation of a new interconnecting staircase between levels 3.1 and 2.1. · received 4 Sept 2025
Replacement roofing works. · received 21 Feb 2025
Office 2.1 and Office G2 Works involve new lighting, mechanical modifications, splitting an existing meeting room into two. Office 2.3 Enabling works for a gym and installing a new access control · received 17 Dec 2024
CANCELLED : Office fit out and associated works.
Alterations to existing ground floor offices to include the removal of partitioning in the open plan office space, tea point refurbishment, changing an existing meeting room to a comms rooms, and the removal of an accommodation staircase between ground and first floor and the infilling of the slab.
Layout changes to existing library space at level 3 including associated service alterations. Unit 3.1 and 3.2
Alterations to existing CAT B office space at ground floor including formation of new tea point and associated service alterations
The works comprises of the complete strip out of the 4th floor south side and the penthouse (5th Floor). Removal of all the furniture, fixtures and fittings, strip out of Kitchen, Toilets, CCTV, Alarms, door access system and signage. Internal staircase linking 5th and 4th floors will be removed, existing opening will be infilled with new floor slab. A hoarding will be installed on the 5th floor to segregate the slab infill. Redecoration, reinstatement and associated works. · received 11 Dec 2025
CAT B office fit out to level 2.1 including the installation of a new interconnecting staircase between levels 3.1 and 2.1. · received 4 Sept 2025
Replacement roofing works. · received 21 Feb 2025
Show all 8 rows
Office 2.1 and Office G2 Works involve new lighting, mechanical modifications, splitting an existing meeting room into two. Office 2.3 Enabling works for a gym and installing a new access control · received 17 Dec 2024
CANCELLED : Office fit out and associated works.
Alterations to existing ground floor offices to include the removal of partitioning in the open plan office space, tea point refurbishment, changing an existing meeting room to a comms rooms, and the removal of an accommodation staircase between ground and first floor and the infilling of the slab.
Layout changes to existing library space at level 3 including associated service alterations. Unit 3.1 and 3.2
Alterations to existing CAT B office space at ground floor including formation of new tea point and associated service alterations